COMBAT EVENTS FOR 06/27/42

ADJUST TASK FORCE MISSIONS 
CALCULATE RANGE TO ENEMY
CALCULATE AIR SUPERIORITY
ASSIGN COMPUTER CONTROLLED UNITS
Combat Events:
NAVAL REACTION PHASE
LOADING/UNLOADING TASK FORCES
TASK FORCE LOADING/UNLOADING COMPLETE
CALCULATING TASK FORCE PATHS
MINESWEEPING OPERATIONS
NAVAL MOVEMENT PHASE
ADJUST SHIP FUEL
NIGHT AIR OPERATIONS PHASE
AIR NIGHT STRIKES
AIRCRAFT LANDING
SHIP CREWS PERFORM DAMAGE CONTROL
SURFACE COMBAT CHECK
DIVIDE CRIPPLED TFs
SHIP CREWS PERFORM DAMAGE CONTROL
SHIP CREWS PERFORM DAMAGE CONTROL
REPAIRING SHIPS
END 12 HOUR PULSE
DIVIDE CRIPPLED TFs
CHECKING TF FUEL
TF'S RETURN TO PORT
Combat Events:
NAVAL REACTION PHASE
LOADING/UNLOADING TASK FORCES
TASK FORCE LOADING/UNLOADING COMPLETE
CALCULATING TASK FORCE PATHS
MINESWEEPING OPERATIONS
NAVAL MOVEMENT PHASE
ADJUST SHIP FUEL
AIR OPERATIONS PHASE : AM
TF 5 sights Japanese Float Fighter at 110,126 near Feni Islands
TF 5 sights Japanese Fighter Bomber at 110,126 near Feni Islands
Hudson III (LR) reports submarine wake at 112, 187 near Palmerston North
Hudson I reports suspected submarine at 97, 154 near Bundaberg
B-17D Fortress sighting report: 2 Japanese ships at 91,168 near Sydney, speed 19, Moving West
AIR STRIKES
AIRCRAFT LANDING
SHIP CREWS PERFORM DAMAGE CONTROL
DIVIDE CRIPPLED TFs
AIR OPERATIONS PHASE : PM
TF 291 followed by Japanese Float Plane at 192,107 near Lahaina
SOC-1 Seagull sighting report: 2 Japanese ships at 112,123 near Lihir, speed 13, Moving Northwest
PBY-5 Catalina reports submarine wake at 93, 167 near Newcastle
Catalina I sighting report: 8 Japanese ships at 101,144 near Tagula Island, speed 13, Moving Southwest
AIR STRIKES
AIRCRAFT LANDING
AIR TRANSPORT PHASE
AIRCRAFT LANDING
SHIP CREWS PERFORM DAMAGE CONTROL
SURFACE COMBAT CHECK
DIVIDE CRIPPLED TFs
SHIP CREWS PERFORM DAMAGE CONTROL
SHIP CREWS PERFORM DAMAGE CONTROL
REPAIRING SHIPS
END 12 HOUR PULSE
DIVIDE CRIPPLED TFs
CHECKING TF FUEL
TF'S RETURN TO PORT
RECALCULATING ZONES OF CONTROL
SUPPLY REQUIREMENTS PHASE
Invercargill expands airfield to size 3
Wellington expands airfield to size 9
MOVING OIL AND RESOURCES
PRODUCTION PHASE
SUPPLY MOVEMENT PHASE
CALCULATING SPOILAGE
AIRCRAFT REPAIR PHASE
AIRCRAFT SUPPLY PHASE
UPGRADING SHIPS
UPGRADING AIR UNITS
UPGRADING LAND UNITS
SUPPLY PHASE COMPLETE
END OF DAY
TRAINING SHIP CREWS
DISBANDING HUMAN CONTROLLED TASK FORCES
ADJUSTING AVIATION SUPPORT
LAND UNIT REPLACEMENT PHASE
AIR UNIT REPLACEMENT PHASE
MERGING SUB UNITS
SUB UNIT MERGE COMPLETE
DIVIDE CRIPPLED TFs
LEADER REASSIGNMENT PHASE
SEARCHING FOR ADJACENT ENEMY UNITS
REASSIGNING TRANSPORT GROUPS
