Page 2 of 2

RE: Mogami-Class Aircraft Cruisers

Posted: Wed Mar 07, 2012 3:03 pm
by John 3rd
Gotcha!

RE: Mogami-Class Aircraft Cruisers

Posted: Wed Mar 07, 2012 3:19 pm
by John 3rd
ORIGINAL: JWE
ORIGINAL: Puhis
Historically Chitose conversion took about 11 months, Chiyoda conversion took about 10 months.
Absolutely ! But then, those vessels were built with integral hangars, workshops, aviation armory, avgas tanks, etc., so maybe it wasn't quite as simple as taking a chain saw to the topsides and replacing them with a flat top, it wasn't conceptually that far off the mark.

A cruiser warship had none of that stuff and it would have taken literally years to make it realistically happen. That's why the Ise took 8 months to have two turrets pulled and a half baked seaplane flight deck and hangar installed, 'above deck'. Woof !!

I truly would forget that nonsense. Because 'non' sense is what it is (or what it isn't, or something; I hate subjunctive negatives). Anyway, I think it's not a good idea [:)]

JWE: I had not seen this Posting. How long--during the war--did the actual conversion of Mogami take?

RE: Mogami-Class Aircraft Cruisers

Posted: Wed Mar 07, 2012 3:23 pm
by DuckofTindalos
She went into drydock at Sasebo on September 1st, 1942 (following temporary repairs at Truk) and recommissioned on April 30th, 1943.

RE: Mogami-Class Aircraft Cruisers

Posted: Wed Mar 07, 2012 3:24 pm
by DuckofTindalos
What John (and I) were talking about was a full CVL conversion of the Mogami; I think there's a crossed communication wire or two here.

RE: Mogami-Class Aircraft Cruisers

Posted: Wed Mar 07, 2012 3:45 pm
by John 3rd
You cleared that up nicely. Got confussed.