RE: New version of the Production Excel sheet
Posted: Thu Jul 22, 2004 6:25 pm
My undestanding of the aircraft production is:
first step: engine production
If enough HI are available, engines are produced and cost 18 HI each (each point of factory will roughly produce one engine a month)
second step: aircraft production
If there are enough engines in the pool for the plane considered, airframes are produced at the cost of 18 + 18 per engine (again) and then the engines are retired from the engine pool and a new plane is added to the airplane pool
Mr Frag says the same as me somewhere on this forum
first step: engine production
If enough HI are available, engines are produced and cost 18 HI each (each point of factory will roughly produce one engine a month)
second step: aircraft production
If there are enough engines in the pool for the plane considered, airframes are produced at the cost of 18 + 18 per engine (again) and then the engines are retired from the engine pool and a new plane is added to the airplane pool
Mr Frag says the same as me somewhere on this forum