RE: T77 3 – 9 December 1942
Posted: Wed Jan 28, 2015 7:57 pm
ORIGINAL: M60A3TTS
The arms crunch is not urban legend, it does happen. The thing is, it is most felt during blizzard of 41 when you are trying to make the most of a short-lived opportunity to push your opponent back. After the multiplier kicks in starting January if your factories are in great shape, the issue tends to be relatively short lived. In the case of the supply crunch the effects are longer term at least for now where there is no 1942 multiplier. But if we operate under the assumption that a force of 7 million can be supplied with a multiplier of 1.0 then that grows to 8.4 million with a supply multiplier of 1.2.
You also have to remember that supply distribution is just as important as supply generation. Uranus never works as it did historically for the Soviets in a typical GC because their truck fleet is crippled as the number of broken trucks will soar to 70k during the 42-43 blizzard period. It is only during the late spring early summer of 43 when the combination of LL trucks and clear weather that reduces the glut of broken trucks and the # needed in the MP once again gives the Red Army teeth.
Meantime you seem to be doing the right things by shifting factories around. Besides airplanes you can also look at AFV production lines in 43-44 that sit with large unused pools of vehicles. Even with the T-34 you can have the equivalent of 5 production lines running each with a peak of 62 tanks a week. You can cut back on one or more if you are sitting pretty with thousands of spares.
I'm doing all I can, I have almost none of the bulk tank factories operating at full value (I may of course come to regret damaging my capacity at a later stage) and all the level bomber factories have been moved, with a lot deliberately lost, in an attempt to reduce production (if I can' t use them, why bother to build them? Even so I now have nearly 8000 planes in the national reserve).
As to rest, still disbanding stuff and driving the TOE of the bulk of my deployed units down as low as I dare.
I'll be honest, loss of MP is not a concern ... when, as in the next post, trying to follow up gains results in a set of catastrophic defeats making actual progress westwards is a bit of an illusion
ORIGINAL: Gabriel B.
ORIGINAL: loki100
I have 20 Tank and 5 Mech Corps, may have formed some tank corps too early but this is one of those feedback loops, lack of Gds+low morale rifle divisions, so felt I needed them to have any meaningful offensive capacity.
That is exacly the number I want on the field in dec 1942, however I do form 4 more tank and 4 mech corps (on reduced toe )
keept on static until may 1943. It takes a lot AP to reactivate ,but the arival of the steppe front helps, and you get the cost of forming them back, when you strip them of vehicles .
In a way this encapsulates my (probably all too obvious) frustration with what has happened since July 1942 in this game. Under the conditions of 1.07 I have done nothing 'wrong' ... I mean I agree its unrealistic to ignore HI evacuation but I've not really over built by the standards of a conventional balanced game








