Scenario editing...
Posted: Fri May 09, 2008 8:18 pm
I know this must be addressed in one of the threads here; maybe someone can point me in the right direction.
I'm working on a scenario now where I need to do two things and I can't figure out how to do it:
1. Change the readiness penalty when changing HQs (I want to lessen the penalty to 25%)
2. Change the cost in PP for creating a HQ
Is this a change to the master file or just a change specific to the scneario?
Thanks in advance.
I'm working on a scenario now where I need to do two things and I can't figure out how to do it:
1. Change the readiness penalty when changing HQs (I want to lessen the penalty to 25%)
2. Change the cost in PP for creating a HQ
Is this a change to the master file or just a change specific to the scneario?
Thanks in advance.