Page 1 of 1
How long do the Dec 16th AM bridges take
Posted: Tue Apr 03, 2012 5:13 pm
by mariandavid
Does anyone have a reliable estimate of how long the tank capable bridges being started when the Dec 16th scenarios start take to complete. Unless of course being an idiot I missed that is shows somewhere on the engineer unit. Would be nice to know in terms of timing moves - especially since the German commander would know!
RE: How long do the Dec 16th AM bridges take
Posted: Tue Apr 03, 2012 5:58 pm
by Lieste
If you get multiple engineers on a crossing, then something like 13:30 or thereabouts is possible.
With disruption or with confusion or delays in the bridge arriving on site that could easily slip to late D1 or early D2.
Later bridges will typically take longer as fatigue takes it toll. Engineer quality and numbers have a large part to play, so this is very rough as a guide.
RE: How long do the Dec 16th AM bridges take
Posted: Thu Apr 05, 2012 4:20 pm
by mariandavid
Thanks: It was the one point of operational known information that the game 'sort of' leaves out the loop to the player.