No of days to improve bases?
Posted: Wed Oct 16, 2002 6:29 am
How long does it take to build up a base from one level to the next?
For example, I need to improve a base. I have 3 engineer units who can be transported to that base.
Given that I can use any unit individually, or any 2 of them or all 3 together;
-how long does it take to build an airfield from a size 2 to a size 3?
-how about from size 2 to size 4?
And the same question applies to naval bases and to fortifications.
Basically, I need to build up an air base / naval base / fortifications and then when they are ready I need to prepare an attack or defense.
I need to estimate how long construction will take so I can plan ahead.
I am aware that for example, it takes longer to build up from a level 4 to a 5 than from a size 3 to a size 4. But I still don’t know how long it actually takes.
For example, I need to improve a base. I have 3 engineer units who can be transported to that base.
Given that I can use any unit individually, or any 2 of them or all 3 together;
-how long does it take to build an airfield from a size 2 to a size 3?
-how about from size 2 to size 4?
And the same question applies to naval bases and to fortifications.
Basically, I need to build up an air base / naval base / fortifications and then when they are ready I need to prepare an attack or defense.
I need to estimate how long construction will take so I can plan ahead.
I am aware that for example, it takes longer to build up from a level 4 to a 5 than from a size 3 to a size 4. But I still don’t know how long it actually takes.