Game manual bug- 4.14.3 example 1
Posted: Thu Dec 17, 2015 8:37 pm
I believe I'm correct in the following analysis, but supply is rather challenging, so please feel free to tell me where I am misinterpreting...
The term 'basic level of supply' needs to be carefully conformed to the in game supply details.
A unit that has been static for many turns will show in supply details (using my static Finnish units as an example)-
Supply Stock 122
Rounds of Stock 2
Supply In Req 66
Supply In 66
So the 2nd sentence on p. 96, under 4.14.3, "Half of a basic level of supply is needed to maintain a unit's readiness." is incorrect. Exactly 1 basic level of supply (BLOS) is needed. So, for the static unit in the example above, the Supply In Req is exactly the same as the BLOS.
The example 1 that follows is similarly incorrect. Correctly would be-
Unit X has a basic supply of 200 points and therefore a Maximum Supply Stock of 400 points. It has a readiness of 100. It has 0 in storage and will therefore request maximum supply of 400 points. Half of its maximum request supply is needed to maintain its readiness... so the remaining 200 points (i.e. 400 - 1/2 of 400) points of newly arrived supply will go into its supply stock.
I'm stopping here, since there's no point reviewing the rest of 4.14 unless the above is correct. [:)]
The term 'basic level of supply' needs to be carefully conformed to the in game supply details.
A unit that has been static for many turns will show in supply details (using my static Finnish units as an example)-
Supply Stock 122
Rounds of Stock 2
Supply In Req 66
Supply In 66
So the 2nd sentence on p. 96, under 4.14.3, "Half of a basic level of supply is needed to maintain a unit's readiness." is incorrect. Exactly 1 basic level of supply (BLOS) is needed. So, for the static unit in the example above, the Supply In Req is exactly the same as the BLOS.
The example 1 that follows is similarly incorrect. Correctly would be-
Unit X has a basic supply of 200 points and therefore a Maximum Supply Stock of 400 points. It has a readiness of 100. It has 0 in storage and will therefore request maximum supply of 400 points. Half of its maximum request supply is needed to maintain its readiness... so the remaining 200 points (i.e. 400 - 1/2 of 400) points of newly arrived supply will go into its supply stock.
I'm stopping here, since there's no point reviewing the rest of 4.14 unless the above is correct. [:)]