Page 1 of 1

Minimum Production Dates

Posted: Thu Oct 19, 2017 11:17 pm
by Robert24
Good Evening All,
In the Editor, how does one modify the Minimum Production Dates
for all nations and units at once. I am trying to avoid resetting the
dates one at a time.
Robert

RE: Minimum Production Dates

Posted: Fri Oct 20, 2017 11:29 am
by BillRunacre
Hi Robert

I'm afraid there is no automatic way, so it will have to be done manually.

However, if you want to make a campaign that starts at an earlier date then there is a way around it, which just requires making a new campaign with the earlier start date, and export from the original campaign all the data you want exported, and import it into the new campaign. The default Production Date will be the new campaign's starting date.

Actually if you are wanting to change them all in your campaign then maybe something like this can be used to achieve that goal. Perhaps give it a try with a test campaign.

Bill

RE: Minimum Production Dates

Posted: Sat Oct 21, 2017 2:00 am
by Robert24
Hi Bill,

That almost worked. The export and import function replaced the first level of the Edit Unit Build,
but the data in the window that is accessed via the Advanced button did not import. I ended up manually
editing what I needed to.

Almost done with the game; it's a modification of 1940 Attack in the West. It is still a campaign, the
date is set to 8 April 1940, and the at start forces are ready for the Norwegian campaign.

Take care!

RE: Minimum Production Dates

Posted: Mon Oct 23, 2017 4:36 pm
by BillRunacre
Sounds interesting Robert, and I'm glad to be of some assistance. [:)]