Airfield Damage Repair and Suppport
Posted: Sun Feb 18, 2018 3:22 pm
I would like to repair some airbases and move support into them so that I can transfer aircraft.
My size 2 temporary port airbases have 50% damage as the rules state for when they were built. However, in spite of having air support units at the base damage is not being repaired at temporary port airbases at the 10% per day rate so the bases stay stuck at 50% damage. How to I get these bases to repair damage?
Also, I overran the Foggia area after bombing the bases full of LW aircraft. So these bases are damaged as well. They don't currently have support units attached. How can I attach support units and repair the air bases?
One trick that I found for the size 2 temporary port air bases is to set them to expand. This brought in GS engineers to some of the bases and started repair. This won't work with a size 3 base like Foggia, though. Also, the GS engineers show up on a somewhat random basis.
Why doesn't 10% per day repair work for a base with ground support elements?
Is there any way to take direct control of GS engineers so I can send them where I want them?
Is there a way to send ground support to a base manually?
Thanks,
GeneralDad
My size 2 temporary port airbases have 50% damage as the rules state for when they were built. However, in spite of having air support units at the base damage is not being repaired at temporary port airbases at the 10% per day rate so the bases stay stuck at 50% damage. How to I get these bases to repair damage?
Also, I overran the Foggia area after bombing the bases full of LW aircraft. So these bases are damaged as well. They don't currently have support units attached. How can I attach support units and repair the air bases?
One trick that I found for the size 2 temporary port air bases is to set them to expand. This brought in GS engineers to some of the bases and started repair. This won't work with a size 3 base like Foggia, though. Also, the GS engineers show up on a somewhat random basis.
Why doesn't 10% per day repair work for a base with ground support elements?
Is there any way to take direct control of GS engineers so I can send them where I want them?
Is there a way to send ground support to a base manually?
Thanks,
GeneralDad