Factory Evac
Posted: Tue Sep 25, 2018 7:14 am
Not sure if there's a bug.
In the pic the cost to evac each T-34 factory is 1184. The manual say the cost per factory point is Build Cost x 4(after v1.03 Beta 3 - February 7, 2011 patch). I've check the build cost of this T-34 and it 377 which when x4 does not equal 1184 as stated in evac cost.
So bug or have I missed a patch?

In the pic the cost to evac each T-34 factory is 1184. The manual say the cost per factory point is Build Cost x 4(after v1.03 Beta 3 - February 7, 2011 patch). I've check the build cost of this T-34 and it 377 which when x4 does not equal 1184 as stated in evac cost.
So bug or have I missed a patch?
