Page 1 of 1

[1.05b1] Supply base production cost error

Posted: Thu Aug 20, 2020 11:18 pm
by Malevolence
Per the image, Supply Base I all production costs paid. No zone production penalty.

Error, "Paid only 89% of of production costs".

As an aside, it would be great if the "Produces" description listed the expected Logistical Extension value per the other descriptions and values.

Image

Device is Windows 10 Pro 64bit, version 2004 (v19041.421), Intel i7-1065G7 1.30Ghz, 16GB RAM. It is a Surface Pro 7, connected to 2560x1600 display monitor via USB-C. Intel Iris Plus integrated graphics.

For reference, Game Build v 1.05-beta1; Scenario Build 1.05-beta1; Last Game Build used 1.05-beta1; Scenario Version Number #53.



RE: [1.05b1] Supply base production cost error

Posted: Mon Aug 24, 2020 11:59 am
by Vic
The expected production will be shown in upcoming beta 2. Thanks for reporting.
For the key issue i'll need a save game to check the context.
If you still have it please send to vic@vrdesigns.net

best,
Vic