Page 1 of 1

[1.07.06] High speed rail station has 2 different machine costs

Posted: Thu Feb 04, 2021 6:05 am
by Soar_Slitherine
The high speed rail station is listed as costing both 20 machines and 5 machines per turn to construct in the asset details window. The actual amount consumed during construction seems to be 20 per turn, but misleadingly, the asset construction window lists the cost as only 5. This is from a savegame started in patch 1.07.03.


Image

RE: [1.07.06] High speed rail station has 2 different machine costs

Posted: Thu Feb 04, 2021 9:05 am
by Vic
Will be fixed in the upcoming open beta. eta monday.
Thanks for spotting that one. It is indeed very misleading.