Operation Planner
Posted: Tue Dec 27, 2022 7:41 pm
I decided to play around with the new tools. but something is not working the way I want. My intention is this:
The AAW mission starts at 10:00:00 am After 30 minutes, the aircraft from the AAW mission is to switch to the AAW2 mission. Despite the fact that everything is triggered in the Operation Planner window, aircraft with the AAW mission do not switch to the AAW2 mission. I'm wondering what I'm doing wrong. I have attached the saved file. I have attached the saved file
The AAW mission starts at 10:00:00 am After 30 minutes, the aircraft from the AAW mission is to switch to the AAW2 mission. Despite the fact that everything is triggered in the Operation Planner window, aircraft with the AAW mission do not switch to the AAW2 mission. I'm wondering what I'm doing wrong. I have attached the saved file. I have attached the saved file
