Building fortifications time delay
Posted: Sat Jan 14, 2023 8:15 pm
by Moonchild
I've noticed that the building of fortifications by engineers, takes time depending on the "number-of-sides". However, the building of 1-side fortifications takes 70 days which is the same as with building fortifications with 2-sides. Then, the time increases proportionally (105 days etc).

- 1.jpg (28.41 KiB) Viewed 459 times

- 2.jpg (28.51 KiB) Viewed 459 times

- 3.jpg (28.87 KiB) Viewed 459 times
Is this intentional or an oversight? It seems to me that 1-side fortifications should be 35 days.
Re: Building fortifications time delay
Posted: Sat Jan 14, 2023 8:27 pm
by Platoonist
Moonchild wrote: Sat Jan 14, 2023 8:15 pm
Is this intentional or an oversight? It seems to me that 1-side fortifications should be 35 days.
This issue was brought up in a thread from 2021.
https://www.matrixgames.com/forums/view ... s#p4789188
The answer seems to be....it's been in the game's code for so long that even Hubert can't recall why. To prevent fort spamming maybe?
Re: Building fortifications time delay
Posted: Mon Jan 16, 2023 9:06 am
by Moonchild
Ok, thank you, I wasn't aware of this thread. I think that one-side forts should take less time though.