Page 1 of 1

Building fortifications time delay

Posted: Sat Jan 14, 2023 8:15 pm
by Moonchild
I've noticed that the building of fortifications by engineers, takes time depending on the "number-of-sides". However, the building of 1-side fortifications takes 70 days which is the same as with building fortifications with 2-sides. Then, the time increases proportionally (105 days etc).
1.jpg
1.jpg (28.41 KiB) Viewed 459 times
2.jpg
2.jpg (28.51 KiB) Viewed 459 times
3.jpg
3.jpg (28.87 KiB) Viewed 459 times
Is this intentional or an oversight? It seems to me that 1-side fortifications should be 35 days.

Re: Building fortifications time delay

Posted: Sat Jan 14, 2023 8:27 pm
by Platoonist
Moonchild wrote: Sat Jan 14, 2023 8:15 pm
Is this intentional or an oversight? It seems to me that 1-side fortifications should be 35 days.

This issue was brought up in a thread from 2021.

https://www.matrixgames.com/forums/view ... s#p4789188

The answer seems to be....it's been in the game's code for so long that even Hubert can't recall why. To prevent fort spamming maybe?

Re: Building fortifications time delay

Posted: Mon Jan 16, 2023 9:06 am
by Moonchild
Ok, thank you, I wasn't aware of this thread. I think that one-side forts should take less time though.