Page 1 of 1

Wider construction rate control

Posted: Fri Sep 29, 2023 7:52 pm
by mroyer
Allow for two more construction rates (as shown in the figure below).

0% - suspend construction - effectively the construction version of "mothball". In this state, maintenance crews need to be maintained or you will lose a little on the turns of completed construction.

150% - Accelerate the schedule - overtime for everyone! Resource costs doubled. Zone happiness takes a -1 penalty each turn for each construction site at 150%.

-Mark R.
Untitled.jpg
Untitled.jpg (63.42 KiB) Viewed 378 times

Re: Wider construction rate control

Posted: Sat Sep 30, 2023 8:52 pm
by solops
I like those, especially the suspend option.