Page 1 of 1
Rebuilding air squadrons
Posted: Tue Apr 15, 2025 4:38 pm
by DKF12
November 1943
Full campaign against AI
I have noticed that at the front aircraft replacement is frequently delayed. Is it advisable to remove depleted squads to the rear and can you get replacements there sooner
Thanks
Re: Rebuilding air squadrons
Posted: Tue Apr 15, 2025 5:07 pm
by RangerJoe
Supplies are needed to draw replacement aircraft.
Re: Rebuilding air squadrons
Posted: Wed Apr 16, 2025 4:19 am
by dr.hal
IIRC 20K supplies at the base you want the planes to receive replacements.
Re: Rebuilding air squadrons
Posted: Wed Apr 16, 2025 5:53 am
by Chris21wen
From the Air war guide p37
https://www.matrixgames.com/forums/view ... 3&t=396274
To get reinforcement ........
This is all done with the following provisos:
• There’s enough aircraft in the pool (5.1.4.4).
• No more than 12 aircraft can be drawn at any one time.
• A unit can only take replacements once every 7 days.
For Land Based air units one of the following conditions must also apply, with the first one true will taking effect. Note
that an airfield must have less than 59% service or runway damage to be eligible.
• The unit is at an AF with more than 20K supplies (No airfield is needed for seaplanes).
• The HQ (most likely an Air HQ) of the unit is within transfer range of the aircraft model and the HQ’s AF has
more than 20K supplies.
• The Command HQ of the unit is within transfer range of the aircraft model and the HQ’s AF has more than
20K supplies.
Re: Rebuilding air squadrons
Posted: Thu Apr 17, 2025 1:37 pm
by Dutch_slith
Delayed means you just have taken reinforcements and now you you have to wait for 7 days before you're able to take more. You cannot assign more than 12 aircraft to your squadron (exception is upgrade, which is only limited by the available # of aircraft).
Re: Rebuilding air squadrons
Posted: Fri Apr 18, 2025 4:58 pm
by RangerJoe
Dutch_slith wrote: Thu Apr 17, 2025 1:37 pm
Delayed means you just have taken reinforcements and now you you have to wait for 7 days before you're able to take more. You cannot assign more than 12 aircraft to your squadron (exception is upgrade, which is only limited by the available # of aircraft).
Actually, there is a way to assign more than 12 aircraft and then even more can be added later!
Re: Rebuilding air squadrons
Posted: Fri Apr 18, 2025 8:39 pm
by BBfanboy
RangerJoe wrote: Fri Apr 18, 2025 4:58 pm
Dutch_slith wrote: Thu Apr 17, 2025 1:37 pm
Delayed means you just have taken reinforcements and now you you have to wait for 7 days before you're able to take more. You cannot assign more than 12 aircraft to your squadron (exception is upgrade, which is only limited by the available # of aircraft).
Actually, there is a way to assign more than 12 aircraft and then even more can be added later!
Sounds like a 'split the unit' strategy - because the AI will treat each sub-unit like it was a unit. Somewhat gamey, but the AI won't mind ...

Re: Rebuilding air squadrons
Posted: Fri Apr 18, 2025 8:42 pm
by RangerJoe
BBfanboy wrote: Fri Apr 18, 2025 8:39 pm
RangerJoe wrote: Fri Apr 18, 2025 4:58 pm
Dutch_slith wrote: Thu Apr 17, 2025 1:37 pm
Delayed means you just have taken reinforcements and now you you have to wait for 7 days before you're able to take more. You cannot assign more than 12 aircraft to your squadron (exception is upgrade, which is only limited by the available # of aircraft).
Actually, there is a way to assign more than 12 aircraft and then even more can be added later!
Sounds like a 'split the unit' strategy - because the AI will treat each sub-unit like it was a unit. Somewhat gamey, but the AI won't mind ...
Then add even more after that!