Page 1 of 1

Fortification building progress halted

Posted: Wed Oct 15, 2025 7:48 pm
by konstpan
Supplies and engineers in place but progress is halted for some days now. Status message displayed is in red color but cannot figure why.
Screenshot 2025-10-15 224513.png
Screenshot 2025-10-15 224513.png (483.88 KiB) Viewed 116 times

Re: Fortification building progress halted

Posted: Wed Oct 15, 2025 8:03 pm
by btd64
konstpan wrote: Wed Oct 15, 2025 7:48 pm Supplies and engineers in place but progress is halted for some days now. Status message displayed is in red color but cannot figure why.

Screenshot 2025-10-15 224513.png
I believe the red print means that it will build, but it's gonna take forever and cost a lot.So at that point, you're probably better off stopping construction....GP

Re: Fortification building progress halted

Posted: Wed Oct 15, 2025 8:30 pm
by RangerJoe
btd64 wrote: Wed Oct 15, 2025 8:03 pm
konstpan wrote: Wed Oct 15, 2025 7:48 pm Supplies and engineers in place but progress is halted for some days now. Status message displayed is in red color but cannot figure why.

Screenshot 2025-10-15 224513.png
I believe the red print means that it will build, but it's gonna take forever and cost a lot.So at that point, you're probably better off stopping construction....GP
I do believe that the red indicates a problem with the building such as insufficient supplies. I do believe that the base needs 20k+ in supplies to go beyond level 6 fortifications.

Re: Fortification building progress halted

Posted: Wed Oct 15, 2025 9:25 pm
by WEXF
btd64 wrote: Wed Oct 15, 2025 8:03 pm
konstpan wrote: Wed Oct 15, 2025 7:48 pm Supplies and engineers in place but progress is halted for some days now. Status message displayed is in red color but cannot figure why.

Screenshot 2025-10-15 224513.png
I believe the red print means that it will build, but it's gonna take forever and cost a lot.So at that point, you're probably better off stopping construction....GP

Section 8.1 of the Manual reads:
Construction of level 7 through level 9 forts
requires a minimum supply level of 25,000 in base to begin construction.

Re: Fortification building progress halted

Posted: Wed Oct 15, 2025 9:33 pm
by btd64
WEXF wrote: Wed Oct 15, 2025 9:25 pm
btd64 wrote: Wed Oct 15, 2025 8:03 pm
konstpan wrote: Wed Oct 15, 2025 7:48 pm Supplies and engineers in place but progress is halted for some days now. Status message displayed is in red color but cannot figure why.

Screenshot 2025-10-15 224513.png
I believe the red print means that it will build, but it's gonna take forever and cost a lot.So at that point, you're probably better off stopping construction....GP

Section 8.1 of the Manual reads:
Construction of level 7 through level 9 forts
requires a minimum supply level of 25,000 in base to begin construction.
Thank you WEXF....GP

Re: Fortification building progress halted

Posted: Wed Oct 15, 2025 10:06 pm
by konstpan
Yes, I confirm. Increased supply level to 25k+ in the base and fortification's construction resumed.

Thank you.