Depot Priority Management
Posted: Sat Sep 05, 2026 1:56 pm
Hey all,
As I am really trying to fully understand and learn the logistics side of things I am unsure of whether there is a "best" way to handle rail depot priorities. I have read the entire manual from front to back and the logistics sections a few times.
Is there a set way of setting priorities that is better than others? I've seen people have a line of priority 4 depots and claim success. In the past I've always tried to have a line that is going 4, 3, 2, 1. Freight flow either way but I am just wondering if there is a best practice to increase the flowing freight.
Is AI management of depots just the best way to do it?
As I have read through things and been thinking I have pondered the thought of having depots along the rail route set to 4 for 1-2 turns to build up freight stockpiles, then changing its priority to 2 or 3 so it can then send that freight forward. Would that make any sense in limited use (Not for everything obviously)?
As I am really trying to fully understand and learn the logistics side of things I am unsure of whether there is a "best" way to handle rail depot priorities. I have read the entire manual from front to back and the logistics sections a few times.
Is there a set way of setting priorities that is better than others? I've seen people have a line of priority 4 depots and claim success. In the past I've always tried to have a line that is going 4, 3, 2, 1. Freight flow either way but I am just wondering if there is a best practice to increase the flowing freight.
Is AI management of depots just the best way to do it?
As I have read through things and been thinking I have pondered the thought of having depots along the rail route set to 4 for 1-2 turns to build up freight stockpiles, then changing its priority to 2 or 3 so it can then send that freight forward. Would that make any sense in limited use (Not for everything obviously)?