Page 1 of 6

American CV name question.

Posted: Tue Apr 20, 2004 1:39 pm
by Micah Goodman
I asked this question several months back and it never received an answer. Does any one know how WitP will handle American CV’s that shared the same name, but different hull numbers?

RE: American CV name question.

Posted: Tue Apr 20, 2004 2:06 pm
by Mr.Frag
Been answered many times actually, generally sparks off fist fights in the forums each time.

CV's that are sunk early in the war come back later as an Essex class. The turn around time is between 500-600 days. Hull numbers are not tracked due to issues with the database being unable to jump through hoops to deal with the renaming (same reason you can't rename things in the game).

The prior system had some hulls reserved in case some were sunk.

You either had not enough CV's or potentially some extra CV's.

RE: American CV name question.

Posted: Tue Apr 20, 2004 2:14 pm
by Admiral DadMan
It's essentially the same system as PacWar

RE: American CV name question.

Posted: Mon May 03, 2004 11:13 pm
by LTCMTS
My two cents.

Carrier production costs and time do not start with laying down the keel. They start with long lead time items such as elevators, catapults, engineering plants and fire control directors to name a few. Then there is the production of the initial rivets, shell plating, framing and fixtures, many of which are standard, but many of which are not. From the time funding is appropriated and the decision is made to build a carrier, contracts not just with the shipbuilder, but all the subcontractors and sub-sub contractors have to be let, if the contractors are not in the current carrier production base, drawings have to be prepared and released. Materiel, especially steel, has to be ordered, negaotiated with the control board and the other service, then produced. Lead time to laying down the keel took as much as nine as little as six months for carriers.
Then there's slip or building dock availability. Kentucky (BB-65) was laid down on 7 Mar 1942. Her partially completed double bottom was mde water tight and floated out of the slipway on 10 Jun 1942, to make way for carrier construction. No, CA slipways/building docks won't work. Keel length and dead weight required that the "Essex" class carrier be built in a dock/slip in competition with "Iowa" class BBs and "Alaska" class large cruisers.
So "Lexington" is lost on 8 May 1942. The USN decides the next day to replace her with an "Essex" class carrier, above and beyond the six "Essex" class carriers already building at the time of her loss and the two more to be laid down by the end of 1942. All slipways and building docks or either in use or programmed. The large cruisers "Alaska" and "Guam" are building, but not launched, at NY Shipbuilding, which is converting "Cleveland " class cruisers to CVLs. We pick "Guam", have her hull made water-tight and launched while we prepare to lay down a new "Essex" carrier. We save some time by diverting catapults and elevators from the "Independence" conversion program, steal some single, pedastal mounted 5"/38s from CVE construction and take Mk.37 FCD and enclosed twin mounted 5"/38 from another "Cleveland" class cruiser, probably delaying the rebuilding of "California", "Tennessee" or "West Virginia". The main problem is the power plant. Engineering plants of that day are not modular. Boilers, turbines and gear boxes are all specifically designed to meet specific output and hp/wgt requirements and fit into specific spaces in a specific hull. Some of the machinery for the "Guam" can be adapted though as it is still being built. We can also use the steel already ordered for "Guam". This is a good thing because negotiating 20,000 tons of steel away from another program would be horrondous. 20,000 tons of steel builds 600 Sherman tanks, 3,000 heavy bombers, 15 destroyer escorts, 20 LSTs, 4 "Victory" ships, at time when these programs are more important to a "German First" strategy than another "Essex" carrier. Unfortunately, we don't need 9.5" Class A armor plates for an "Essex". All the plate already manufactured will probably have to be remanufactured as the adjustments are made on the production line.
As a result we cut down initial production time to laying down to six months or 8 Nov 1942. This puts us on a timeline with CV-13, Intrepid, laid down on 7 Dec 1942 at Newport News. NN, however, is the lead yard for the "Essex" class and already has six hulls building or under completion. This will be NYSB's first (and only) "Essex carrier. Let's use the game's 600 day building time. Commissioning date is thus, 30 July 1944. We have given up a large cruiser which would have been commissioned on 17 Sep 44 and delayed two "Independence" carriers by six months to 17 Apr 44 and 15 May 44.
There are ten "Essex" class carriers in commission, and 11 building.
So much for flippantly stating that the US could "just" lay down more "Essex" carriers as replacements for battle losses. As it was, those "Essex" carriers that came into service after late '44, were exactly that, battle loss replacements, as the planned numbers under the expansion bills of 1940 and the initial war program was met with the first 12 commissioned. In the same vein, the two "Saipan" class CVLs were included in the FY43-44 plan as replacements for expected attrition among the "Independence" class carriers. And they were laid down and built in place of, not in addition to, the heavy cruiser design they were developed from.
And before mdiehl and Scholl call me an "Axis Fan Boy", let me also catagorically state that it was impossible for the IJN to complete more of the planned 4th and 5th Replenishment Plan ships than they did. The single most destructive thing the US did to the Japanese military-industrial complex wasn't the cutoff in oil and gas shipments, it was cutting of the shipments of scrap steel. The Japanese could seek to replace the deficiency in the SRA. There was no way to replace the loss of 80% of the high grade steel. The national reserve lasted just long enough to complete the ships they did, but there was no steel for more "Taihos" or another "Yamato". Even more important was the limitation on slipways and building docks. OK, go ahead and build two "Shokakus" or "Taihos" instead of "Yamato". But slipway/dock availability actual means you're building your two carriers instead of "Yamato" AND "Musashi". The original "Shokaku" took four years from order to completion, even with Japanese naval industry on a near-war footing. So we lay down "Shokaku 2" on 4 Nov 37 instead of "Yamato" and "Zuikaku 2" on 29 Mar 38. We launch the first on 1 Nov 39 and complete on 15 Nov 40, the second on 30 Mar 40 and 1 Apr 41 respectively. We lay down the next two on 15 Nov 39 and 15 Apr 40 respectively, completing by 15 Nov 42 and 15 Apr 43. The residual steel is used to lay down a final "Shokaku" class carrier on 1 Dec 41, completing (?) on 1 Dec 44. This gives you two more carriers by war's start, two more during the attrition phase. Use them well. But where do you get the steel and alloys to build the aircraft needed to equipt these carriers? Where do you get the pilots, when you don't have the resources to build training a/c or provide enough fuel? Where do you get plant capacity, when it didn't exist? As a further point on Japanese industrial inflexibility, if you diverted all the steel used in all the tanks and field artillery built for the IJA between 1941 and 1945, you might get enough for two heavy cruisers or 1.5 "Unryus". Or do you just ignore the "terror" of logistics and strategic economic mobilization in order to create the end result you want?
I would consider reading "McNair Paper #50: Mobilizing U.S. Industry in World War II" by Alan L. Gropman, published by the National Defense University in 1996, along with a number of other sources before making extravegent statements about what US industry in WW2 could or couldn't do.

RE: American CV name question.

Posted: Tue May 04, 2004 12:17 am
by madflava13
LTCMTS-
You raise the right points - I agree with your analysis. From what I understand Gary Grigsby made the call and he's not going to be changing his mind any time soon.

I don't like the decision to give the USN "extra" carriers (and I'm a part-time Allied fan boy), but I guess there's nothing to be done about it at this point. I'll be instituting a house rule in any game I play keeping any "extra" CVs in Port for the duration. Thats the best we can hope for right now.

I'll probably send mine to Anchorage to stay out of the way...[8|]

RE: American CV name question.

Posted: Tue May 04, 2004 12:21 am
by tsimmonds
Excellent analysis LTCMTS. Just one quibble: if you don't build Yamato and Musashi (and thus presumably Shinano) doesn't that leave you with an awful lot of steel lying around? Surely enough to build a few Shokaku/Unryu? Granted, you have to make the committment to CVs in time, but...?

RE: American CV name question.

Posted: Tue May 04, 2004 12:31 am
by Ron Saueracker
ORIGINAL: LTCMTS

My two cents.

Carrier production costs and time do not start with laying down the keel. They start with long lead time items such as elevators, catapults, engineering plants and fire control directors to name a few. Then there is the production of the initial rivets, shell plating, framing and fixtures, many of which are standard, but many of which are not. From the time funding is appropriated and the decision is made to build a carrier, contracts not just with the shipbuilder, but all the subcontractors and sub-sub contractors have to be let, if the contractors are not in the current carrier production base, drawings have to be prepared and released. Materiel, especially steel, has to be ordered, negaotiated with the control board and the other service, then produced. Lead time to laying down the keel took as much as nine as little as six months for carriers.
Then there's slip or building dock availability. Kentucky (BB-65) was laid down on 7 Mar 1942. Her partially completed double bottom was mde water tight and floated out of the slipway on 10 Jun 1942, to make way for carrier construction. No, CA slipways/building docks won't work. Keel length and dead weight required that the "Essex" class carrier be built in a dock/slip in competition with "Iowa" class BBs and "Alaska" class large cruisers.
So "Lexington" is lost on 8 May 1942. The USN decides the next day to replace her with an "Essex" class carrier, above and beyond the six "Essex" class carriers already building at the time of her loss and the two more to be laid down by the end of 1942. All slipways and building docks or either in use or programmed. The large cruisers "Alaska" and "Guam" are building, but not launched, at NY Shipbuilding, which is converting "Cleveland " class cruisers to CVLs. We pick "Guam", have her hull made water-tight and launched while we prepare to lay down a new "Essex" carrier. We save some time by diverting catapults and elevators from the "Independence" conversion program, steal some single, pedastal mounted 5"/38s from CVE construction and take Mk.37 FCD and enclosed twin mounted 5"/38 from another "Cleveland" class cruiser, probably delaying the rebuilding of "California", "Tennessee" or "West Virginia". The main problem is the power plant. Engineering plants of that day are not modular. Boilers, turbines and gear boxes are all specifically designed to meet specific output and hp/wgt requirements and fit into specific spaces in a specific hull. Some of the machinery for the "Guam" can be adapted though as it is still being built. We can also use the steel already ordered for "Guam". This is a good thing because negotiating 20,000 tons of steel away from another program would be horrondous. 20,000 tons of steel builds 600 Sherman tanks, 3,000 heavy bombers, 15 destroyer escorts, 20 LSTs, 4 "Victory" ships, at time when these programs are more important to a "German First" strategy than another "Essex" carrier. Unfortunately, we don't need 9.5" Class A armor plates for an "Essex". All the plate already manufactured will probably have to be remanufactured as the adjustments are made on the production line.
As a result we cut down initial production time to laying down to six months or 8 Nov 1942. This puts us on a timeline with CV-13, Intrepid, laid down on 7 Dec 1942 at Newport News. NN, however, is the lead yard for the "Essex" class and already has six hulls building or under completion. This will be NYSB's first (and only) "Essex carrier. Let's use the game's 600 day building time. Commissioning date is thus, 30 July 1944. We have given up a large cruiser which would have been commissioned on 17 Sep 44 and delayed two "Independence" carriers by six months to 17 Apr 44 and 15 May 44.
There are ten "Essex" class carriers in commission, and 11 building.
So much for flippantly stating that the US could "just" lay down more "Essex" carriers as replacements for battle losses. As it was, those "Essex" carriers that came into service after late '44, were exactly that, battle loss replacements, as the planned numbers under the expansion bills of 1940 and the initial war program was met with the first 12 commissioned. In the same vein, the two "Saipan" class CVLs were included in the FY43-44 plan as replacements for expected attrition among the "Independence" class carriers. And they were laid down and built in place of, not in addition to, the heavy cruiser design they were developed from.
And before mdiehl and Scholl call me an "Axis Fan Boy", let me also catagorically state that it was impossible for the IJN to complete more of the planned 4th and 5th Replenishment Plan ships than they did. The single most destructive thing the US did to the Japanese military-industrial complex wasn't the cutoff in oil and gas shipments, it was cutting of the shipments of scrap steel. The Japanese could seek to replace the deficiency in the SRA. There was no way to replace the loss of 80% of the high grade steel. The national reserve lasted just long enough to complete the ships they did, but there was no steel for more "Taihos" or another "Yamato". Even more important was the limitation on slipways and building docks. OK, go ahead and build two "Shokakus" or "Taihos" instead of "Yamato". But slipway/dock availability actual means you're building your two carriers instead of "Yamato" AND "Musashi". The original "Shokaku" took four years from order to completion, even with Japanese naval industry on a near-war footing. So we lay down "Shokaku 2" on 4 Nov 37 instead of "Yamato" and "Zuikaku 2" on 29 Mar 38. We launch the first on 1 Nov 39 and complete on 15 Nov 40, the second on 30 Mar 40 and 1 Apr 41 respectively. We lay down the next two on 15 Nov 39 and 15 Apr 40 respectively, completing by 15 Nov 42 and 15 Apr 43. The residual steel is used to lay down a final "Shokaku" class carrier on 1 Dec 41, completing (?) on 1 Dec 44. This gives you two more carriers by war's start, two more during the attrition phase. Use them well. But where do you get the steel and alloys to build the aircraft needed to equipt these carriers? Where do you get the pilots, when you don't have the resources to build training a/c or provide enough fuel? Where do you get plant capacity, when it didn't exist? As a further point on Japanese industrial inflexibility, if you diverted all the steel used in all the tanks and field artillery built for the IJA between 1941 and 1945, you might get enough for two heavy cruisers or 1.5 "Unryus". Or do you just ignore the "terror" of logistics and strategic economic mobilization in order to create the end result you want?
I would consider reading "McNair Paper #50: Mobilizing U.S. Industry in World War II" by Alan L. Gropman, published by the National Defense University in 1996, along with a number of other sources before making extravegent statements about what US industry in WW2 could or couldn't do.

Wow...more like 2 bucks! Good points. Much earlier, I advocated using the original names for ships named after sunken vessels or those of cancelled ships of the class. The warship's correct availability is more important than the name.

RE: American CV name question.

Posted: Tue May 04, 2004 1:04 am
by Mike Scholl
LCTMTS Thank you for providing the forum with a really well reasoned and researched
explanation of why you can't just call up the factory/shipyard and say "I changed my
mind---give me umpteen of something else". The only thing you left out of the picture
is that the US, almost alone among the participants of WWII had the luxury of actually
creating and using purpose-built production facilities. Kaiser first built shipyards, then
built ships in them. Ford first built Willow Run, then built B-24's in it. Boeing put up a
brand new plant in Wichita to build B-29's in. The list goes on and on.

But you are right about the priorities bottlenecks, Even America couldn't just say, OK
"build a couple more slipways big enough for an Essex" without having to divert or can-
cell something else to obtain the materials and labor to do it. Just look at the variety
of power plants installed in DE's. There are something like 5 different ones, each a re-
sult of "bottlenecks" in producing the one before it. And that's in the most powerful and
productive Economy in the world. For the Japanese it was much worse.

RE: American CV name question.

Posted: Tue May 04, 2004 1:55 am
by LTCMTS
Irrelevant (or should we call you Zippy?), please read my entire post and the alternatives to Yamato.
Mike, you hit another head on the nail, which is that even the US massive military-industrial complex faced shortages and bottlenecks. The DE was originally designed with a geared turbine powerplant for 25 knots. Because of the limited gear production capability (which was superior to any other seapower's), the powerplant had to be substituted. Two of those substitutes actually competed with other requirements, pure diesel with LSTs and diesel-electric with subs. It also explains why the "River" class frigates, seemingly poor subs for DEs, were built, since they used reciprocating engines and were built to mercantile standards.
The slipway/dock problem also limits the alternative of building 35,000 or 45,000 tons BBs in place of the Yamatos.
Another post I've seen wants to design "no Washington Treaty" scenarios. Fine, but keep in mind the realities of the US-Japanese industrial power relationship, which was even more in US favor in 1922. When the Washington Treaty was being negotiated, the US had sixteen capital ships laid down, building and completing against seven Japanese (and no British). Financial and industrial constraints essentially limited the Japanese to completing one capital ship per year on average. At this rate, the last No.13 class BB would be completed in 1935. This building program would have competed with the heavy cruiser and carrier program of the same period. More importantly, it would have diverted funds from the massive investment in infrastructure improvement the Japanese made in the late 20's and early 30's. At a time (1926-1934) when the US modernized and rebuilt some thirteen BBs, the Japanese did only the three Kongos and started on Yamashiro. The investment made allowed them to completely rebuild some twelve battlecruisers, battleships and converted CB/BB carriers between 1933 and 1940, nine between 1935-38. In comparison, projecting a trend based on Congressional appropriations for 1919-21, the US would have completed at least one and a half capital ships a year on average, with limited impact on the heavy cruiser program. The 1916 program (4 Colorados, 6 South Dakotas, 6 Lexingtons) would have been completed by 1931. The follow-on classes based on the General Board data and the "spring styles" generated by Taylor for BB 1919 would have been an improved, more heavily armored South Dakota with 23-25 kts and then a combination of South Dakota armament and armor with Lexington speed and size. The funds appropriated by Congress between 1925 and 1933 for BB modernization would have been sufficient for 6-8 of these ships, completed by 1936-37. In the time it took Japan to build fifteen BBs and CBs, the US would have completed 22. There is no doubt some of the US and Japanese CBs would have been completed as carriers. Congress refused to authorize purpose built carriers in 1919, 1920 and 1921. Both nations recognized the impact naval aviation would have on surface actions, though maybe not where it would all end, and wanted their own a/c at sea, a requirement light a/c launched from platforms and floatplanes launched from catapults would not fill. In any case, Japan, in any long war with the US was going to be buried, whether in 1922 or 1941, as long as US morale held out.

RE: American CV name question.

Posted: Tue May 04, 2004 2:51 am
by tsimmonds
Irrelevant (or should we call you Zippy?), please read my entire post and the alternatives to Yamato.
Yah, ok, you build the carriers, where are the pilots (there were plenty of planes)? Obviously shipbuilding priorities were not the only thing the Japanese would have needed to change. If you are going to start changing things, howzabout just going back to 1931 and leaving China alone?

Another excellent post. You've been reading up.

Thing is though, one man's fantasy scenario is another man's alternative reality. Everyone has his own point of reference. Your's clearly is very rich in detail regarding this subject. Many others will not be so particular. But I for one truly appreciate the discrimination.....

RE: American CV name question.

Posted: Tue May 04, 2004 3:38 am
by TIMJOT
LTCMTS, Just wanted to say that many here are in complete agreement with you. However 2by3 has made it known that for some reason Gary Grisby has dug his heels in on this issue and will not budge no matter how many of us point out it's flawed logic. What particularly irks me is that even if we are to except this flawed reasoning, then at most only 2 extra Essex should be respawned since the four historical CV losses should by his own premise must already be factored into the historic build rates.

Personally when playing the allies I will leave any respawned CVs parked on the west coast and when playing the Japanese insist my opponent to do the same. To me the only legitimate use of the respawning rules is as an AI cheat.

RE: American CV name question.

Posted: Tue May 04, 2004 3:58 am
by bradfordkay
Personally when playing the allies I will leave any respawned CVs parked on the west coast and when playing the Japanese insist my opponent to do the same. To me the only legitimate use of the respawning rules is as an AI cheat.

So does this mean that you will not use the Essex class Yorktown that was built and used in the war? Wasn't there also another Hornet?

RE: American CV name question.

Posted: Tue May 04, 2004 4:35 am
by Ron Saueracker
ORIGINAL: bradfordkay
Personally when playing the allies I will leave any respawned CVs parked on the west coast and when playing the Japanese insist my opponent to do the same. To me the only legitimate use of the respawning rules is as an AI cheat.

So does this mean that you will not use the Essex class Yorktown that was built and used in the war? Wasn't there also another Hornet?

And Lexington(CV 16) and Wasp(CV18). The thing is two Essex class (Reprisal and Iwo Jima) were laid down but not completed, six others authorized and cancelled and Oriskany finished to an altered design postwar. So, Yorktown, Hornet, Lexington, Wasp, Reprisal and Iwo Jima already represent the six potential prewar carrier loss/respawns so I don't see the need.

RE: American CV name question.

Posted: Tue May 04, 2004 4:57 am
by bradfordkay
Yeah, Ron, I knew there were more, but I didn't have a reference handy and was going to guess Hornet and Wasp.

RE: American CV name question.

Posted: Tue May 04, 2004 5:12 am
by Ron Saueracker
And this for those who will experience Mogami.... I would think ships named for Pacific victories should not be allowed to be named as such.[:D]

RE: American CV name question.

Posted: Tue May 04, 2004 1:07 pm
by TIMJOT
ORIGINAL: bradfordkay
Personally when playing the allies I will leave any respawned CVs parked on the west coast and when playing the Japanese insist my opponent to do the same. To me the only legitimate use of the respawning rules is as an AI cheat.

So does this mean that you will not use the Essex class Yorktown that was built and used in the war? Wasn't there also another Hornet?

No, CV10 (Yorktown), CV12 (Hornet), CV16 (Lexington), CV18 (Wasp) are in the game under there original names. Bon Homme Richard, Kearsarge, Cabot, and Oriskany
respectively. This is NOT a naming issue this is about adding ships that were never built and could not have been built in the time frames aloted in the game.

RE: American CV name question.

Posted: Tue May 04, 2004 1:22 pm
by Mr.Frag
ORIGINAL: TIMJOT
ORIGINAL: bradfordkay
Personally when playing the allies I will leave any respawned CVs parked on the west coast and when playing the Japanese insist my opponent to do the same. To me the only legitimate use of the respawning rules is as an AI cheat.

So does this mean that you will not use the Essex class Yorktown that was built and used in the war? Wasn't there also another Hornet?

No, CV10 (Yorktown), CV12 (Hornet), CV16 (Lexington), CV18 (Wasp) are in the game under there original names. Bon Homme Richard, Kearsarge, Cabot, and Oriskany
respectively. This is NOT a naming issue this is about adding ships that were never built and could not have been built in the time frames aloted in the game.

It most definitely *is* a naming issue. Ships in the database each occupy a slot. This slot has all the information about the ship. It points back to a class slot. This slot contains all the information about the class of ships, including upgrades. Hacking into the database on the fly to change names is very much a code issue. Please do not try and pretend otherwise.

As I have said before, the game has a very simple solution. When the replacement CV shows up, park it somewhere for the duration of the war. It costs you nothing to do so. You can even wait until the next "official" hull shows up then swap the two, leaving the "named" ship back in play and the "unnamed" ship sitting in the USA port for the war.

All it requires is a little self control on the part of the Allied player.

RE: American CV name question.

Posted: Tue May 04, 2004 2:36 pm
by Bulldog61
ORIGINAL: Mr.Frag
ORIGINAL: TIMJOT
ORIGINAL: bradfordkay



So does this mean that you will not use the Essex class Yorktown that was built and used in the war? Wasn't there also another Hornet?

No, CV10 (Yorktown), CV12 (Hornet), CV16 (Lexington), CV18 (Wasp) are in the game under there original names. Bon Homme Richard, Kearsarge, Cabot, and Oriskany
respectively. This is NOT a naming issue this is about adding ships that were never built and could not have been built in the time frames aloted in the game.

It most definitely *is* a naming issue. Ships in the database each occupy a slot. This slot has all the information about the ship. It points back to a class slot. This slot contains all the information about the class of ships, including upgrades. Hacking into the database on the fly to change names is very much a code issue. Please do not try and pretend otherwise.

As I have said before, the game has a very simple solution. When the replacement CV shows up, park it somewhere for the duration of the war. It costs you nothing to do so. You can even wait until the next "official" hull shows up then swap the two, leaving the "named" ship back in play and the "unnamed" ship sitting in the USA port for the war.

All it requires is a little self control on the part of the Allied player.

The challenge is The respawned CV's were CV's that were built CV's 10,12,16 and 18 were built and whether or not you use the original names or the respawned names is irrelevent.

RE: American CV name question.

Posted: Tue May 04, 2004 3:03 pm
by TIMJOT
ORIGINAL: Mr.Frag
ORIGINAL: TIMJOT
ORIGINAL: bradfordkay



So does this mean that you will not use the Essex class Yorktown that was built and used in the war? Wasn't there also another Hornet?

No, CV10 (Yorktown), CV12 (Hornet), CV16 (Lexington), CV18 (Wasp) are in the game under there original names. Bon Homme Richard, Kearsarge, Cabot, and Oriskany
respectively. This is NOT a naming issue this is about adding ships that were never built and could not have been built in the time frames aloted in the game.

It most definitely *is* a naming issue. Ships in the database each occupy a slot. This slot has all the information about the ship. It points back to a class slot. This slot contains all the information about the class of ships, including upgrades. Hacking into the database on the fly to change names is very much a code issue. Please do not try and pretend otherwise.

As I have said before, the game has a very simple solution. When the replacement CV shows up, park it somewhere for the duration of the war. It costs you nothing to do so. You can even wait until the next "official" hull shows up then swap the two, leaving the "named" ship back in play and the "unnamed" ship sitting in the USA port for the war.

All it requires is a little self control on the part of the Allied player.

Frag, I am not pretending anything. Joel Billings himself said that the system in placed had nothing to do with renaming Essex CVs after Pre-war CVs lossed in combat. According to him, its Gary's contention that the USN had a set number of CVs it wanted to be operational at a given time (TRUE) and the US could simply ramp up production to make up for losses ( PARTLY TRUE ) and finally that they could replace said CV within 550 days of its sinking ( FALSE ).

The question is why respawn or rename at all? Simply adding ships to the END of the que, useing names of Essex CVs incomplete or unused. Examples; Reprisal, Antietam, Vallely Forge, Lake Champlain, Crown Point ect.....

BTW, please read my previous post, where I recomend doing exactly what you suggest in regards to working around the issue.

RE: American CV name question.

Posted: Tue May 04, 2004 3:37 pm
by TIMJOT
ORIGINAL: MikeKraemer


The challenge is The respawned CV's were CV's that were built CV's 10,12,16 and 18 were built and whether or not you use the original names or the respawned names is irrelevent.

What challenge? NO one is suggesting that you substract any of the historical 13 Essex CV hulls from the oob. What is being objected to is the ADDITION of up to 6 UNHISTORIC hulls being "INSERTED" 550 days after a Pre-war CV loss.

Here is a possible example of the 13.

1) CV9 Essex
2) CV10 Bon Homme Richard (YORKTOWN)
3) CV11 Intrepid
4) CV12 Kearsarge (HORNET)
5) CV13 Franklin
6) CV14 Ticonderoga
7) CV15 Randolph
8) CV16 Cabot (LEXINGTON)
9) CV17 Bunker Hill
10) CV18 Oriskany (WASP)
11) CV19 Hancock
12) CV20 Bennington
13) CV21 Boxer


If you like add two more at the end of the que for the a-hisitorical loss of the Enterprise and Saratoga.

14) CV22 Reprisal (ENTERPRISE)
15) CV23 Valley Forge (SARATOGA)

Of course if the game last beyond Aug45 then you can add in succession.

Antietam
Lake Champlain
Crown Point
Wright

ect....