Production Adjustments
Posted: Mon Dec 20, 2004 5:54 pm
In looking over anticipated aircraft production and the necessary engine types "x" needed I have noticed that engine production of a particular brand "y" does not appear to be needed. If I reduce production of engine type "y" to zero what will happen in subsequent turns? Should I see production of engine type "x" increase with the additional available capacity?