Page 1 of 1
replacements delayed ?
Posted: Mon Aug 10, 2009 1:27 pm
by emorbius44
Hello;
I'm playing an e-mail guadalcanal scenario as the Japanese player. For air groups in the replacement area it says "replacements delayed" and the "draw from pool" area is grayed out. That has gone on for several turns. Can someone tell me what that's about?
thanks;
Bob
RE: replacements delayed ?
Posted: Mon Aug 10, 2009 1:33 pm
by Mike Solli
Are you out of pilots in your pool or appropriate aircraft in their pool?
RE: replacements delayed ?
Posted: Mon Aug 10, 2009 1:37 pm
by TheTomDude
I have this as well as Japan. But I'm neither short of appropriate planes nor pilots.
RE: replacements delayed ?
Posted: Mon Aug 10, 2009 1:39 pm
by PeteG662
Questions for both of you:
1. Have you recently taken replacement planes in those groups?
2. Is there a supply issue or shortage at those locations?
3. Is there airfield or port damage in the hex?
RE: replacements delayed ?
Posted: Mon Aug 10, 2009 1:41 pm
by Dixie
There is a maximum number of replacements you can draw from the pool (iirc the period is a week) for each air unit. Same for the Allies.
RE: replacements delayed ?
Posted: Mon Aug 10, 2009 1:46 pm
by TheTomDude
ORIGINAL: Dixie
There is a maximum number of replacements you can draw from the pool (iirc the period is a week) for each air unit. Same for the Allies.
Well that explains a lot. I usually notice this while one or more new airgroups are fitting out. Makes sense then.