Page 1 of 1

Axis Aircraft Production Question

Posted: Fri Jun 20, 2025 12:26 pm
by Cones2002
I have 2 airframes left in my He 219A-2 stockpile for prototype production and I don't have an airframe factory on it.

I've been stuck with these 2 airframes for a handful of days without any new planes being put together and I have the parts for it.

Does not having an airframe factory assigned reduce the chance of a new plane being constructed?

Re: Axis Aircraft Production Question

Posted: Sat Jun 21, 2025 4:25 pm
by simovitch
So you have parts and engines? I don't think that not having the factory precludes the assembly of already completed aircraft components. Did you try changing the priority setting?

Re: Axis Aircraft Production Question

Posted: Mon Jun 23, 2025 5:26 am
by mark dolby
Hi.
Having a full set of engine, parts and airframe in excess of a production line usually allows the finish of a complete aircraft but it can take several days to a week for it to happen for each one. (almost like the workers are doing it in their own time) BUT I have noticed that once you have moved the production line away from that type the last set does not get completed. Museum parts?
Mark.

Re: Axis Aircraft Production Question

Posted: Wed Jun 25, 2025 3:12 pm
by Cones2002
simovitch wrote: Sat Jun 21, 2025 4:25 pm So you have parts and engines? I don't think that not having the factory precludes the assembly of already completed aircraft components. Did you try changing the priority setting?
I have parts and engines. It's on priority 1 as well.

Re: Axis Aircraft Production Question

Posted: Wed Jun 25, 2025 3:14 pm
by Cones2002
mark dolby wrote: Mon Jun 23, 2025 5:26 am Hi.
Having a full set of engine, parts and airframe in excess of a production line usually allows the finish of a complete aircraft but it can take several days to a week for it to happen for each one. (almost like the workers are doing it in their own time) BUT I have noticed that once you have moved the production line away from that type the last set does not get completed. Museum parts?
Mark.
Makes sense. The delay could be longer for prototype aircraft due to low numbers of production components typically made.

I guess I should keep it on 12 days for prototypes, so make sure my production stays smooth