Ok, looked all over for this question could not find it and need an answer.

As the US when I click on the Intel screen and go to Aircraft Reinforcement Schedule, it shows planes and their arrival dates and locations. I also have factories that produce 410 + (830 - rd) a month. So does this meant that each month I get that many aircraft added to my replacement pool and then whatever arrives through the reinforcement schedule is extra and seperate from what I produce in my aircraft factories? Thanks.
There is no chance, no destiny, no fate, that can circumvent or hinder or control the firm resolve of a determined soul.
Aficionado
Posts: 5
Joined: Mon Jul 05, 2004 2:28 pm

RE: US Plane Production and Replacement Schedule

Post by Aficionado »

The reinforcement schedule provides formations which can have a varying number of planes. For example, a group of 72 P40Es might arrive with just 40 planes. The rest would be filled out from the replacement pool.

The planes produced by factories are fed into the replacement pool. For example, 50 B17Es are produced each month, and there are also 5 B17E replacements provided, for a total of 55 B17E replacements added to the pool each month.
Aficionado
"One horselaugh is worth ten thousand syllogisms." H.L. Mencken
"How can I tell that the soothing influence of tobacco upon my nervous system may not have enabled me to comport myself with calm and courtesy in some awkward personal encounte
HawaiiFive-O
Posts: 295
Joined: Fri Dec 20, 2002 10:21 pm
Location: USA

RE: US Plane Production and Replacement Schedule

Post by HawaiiFive-O »

'Replacement Rate' is off-map production. You get that free. 'Production Rate' is on-map production. If you feed your on-map factories with the requisite Heavy Industry, you get more planes, over and above the 'Replacement Rate' figures.

Editing here because I misread your query somewhat.

NO reinforcing squadrons get free planes, they all draw from the pools. The pools are fed by the 'Replacement Rate' and 'Production Rate', which I explained above.

Hope this helps.
Image
SunDevil_MatrixForum
Posts: 782
Joined: Wed Jun 13, 2001 8:00 am
Location: Tempe, AZ

RE: US Plane Production and Replacement Schedule

Post by SunDevil_MatrixForum »

Thank you.
There is no chance, no destiny, no fate, that can circumvent or hinder or control the firm resolve of a determined soul.
HawaiiFive-O
Posts: 295
Joined: Fri Dec 20, 2002 10:21 pm
Location: USA

RE: US Plane Production and Replacement Schedule

Post by HawaiiFive-O »

Actually, Aficionado is correct, you get free planes with the reinforcing squadrons, but they are often short and need to be filled out from the pools.

Sorry for the confusion.
Image
SunDevil_MatrixForum
Posts: 782
Joined: Wed Jun 13, 2001 8:00 am
Location: Tempe, AZ

RE: US Plane Production and Replacement Schedule

Post by SunDevil_MatrixForum »

We'll forgive you this time.... [:D]
There is no chance, no destiny, no fate, that can circumvent or hinder or control the firm resolve of a determined soul.
HawaiiFive-O
Posts: 295
Joined: Fri Dec 20, 2002 10:21 pm
Location: USA

RE: US Plane Production and Replacement Schedule

Post by HawaiiFive-O »

[:D]

You are always so helpful, I wanted to help you in turn.