Linked events from a DE after a specific period of time

Post bug reports and ask for help with other issues here.
Post Reply
User avatar
Elessar2
Posts: 1440
Joined: Wed Nov 30, 2016 12:35 am

Linked events from a DE after a specific period of time

Post by Elessar2 »

Been looking over some DE options. I want some to have the secondary linked script (Supply/Unit/Strength/etc.) fire after a specific period of time has passed since the DE came up and Yes (No) was chosen. But apparently the only timing control a scripter has is to just plop down a date, and that is it. So for a DE script whose timing isn't carved into stone (because of Condition Positions and such), the DE could conceivably happen AFTER the other linked script (in which case the latter won't fire at all). IOW I want say a six month delay after Yes has been chosen-any way to put that in there?
User avatar
Taxman66
Posts: 2279
Joined: Tue Mar 18, 2008 10:28 pm
Location: Columbia, MD. USA

Re: Linked events from a DE after a specific period of time

Post by Taxman66 »

Can you chain a dummy event 6 months later that checks the status of the answer of the primary event and if 'true' will then fire the effects you are looking for?
"Part of the $10 million I spent on gambling, part on booze and part on women. The rest I spent foolishly." - George Raft
Post Reply

Return to “Tech Support”