ORIGINAL: pad152
Andy
My concen is limited to 1941, early 1942 where the allies have fewer units and short of engineer units of all types. I've played with variable reinforcements on and have seen games where the allies can't do much of anything until March of 1942 because of the shortages of engineer units (can't build or expand forward bases, limited AV support). It was this type of thing that forced the allied player to strip/save engineer units from the Dutch resource area.
Just from the US perspective -- in AE you won't feel the same pressure to salvage engineers and base forces from the PI and DEI. The US gets more of these units (including the CPNABs) at start than in stock. For example, two aviation base forces are part of the Pensacola convoy on December 7th. The bigger trouble is finding enough fighting strength to guard them, and shipping/escorts to move them.
Having said that, the heavy flow of US engineers doesn't start until late 42 (when Seabees start arriving in regimental-sized bunches) and becomes a flood in 1943 (when the Engineer Aviation Battalions arrive en masse) and a Tsunami in 1944-45 (with brigade-sized Combat Engineer LCUs).
As the allied player you *will* want to protect your separate Combat Engineer regiments and battalions. They are in short supply until mid-1944.





[/center]

