ORIGINAL: sanderz
Hi - a couple of questions
Am a bit confused about the LCU production "chart".
Are the "Accumulative armament points" (straight blue line) what you need or what you are projected to produce? I assumed the latter but if so the line doesn't seem to change to allow for reduction in production if i turn factories off.
I'll look into it, but I thought it was working fine.
Engine planner
In the pic below the projected need for Ha34 drops in 9/42 by ignoring the build of Helens who are due to upgrade that month. Should tracker assume that the upgraded version of the Helen is built if it has the same engine?
many thanks
1. Why do you have production off for ki-49-1a ? It costs you nothing and if OFF then it will not accumulate R&D points.
2. By having the production off, then the upgrade iteration thinks that there will be no upgrade except for the 65 repairing. I probably should fix this, but having production off is not a good idea for R&D anyway.