Expenditures/Budget( Available/Expenditure/Balance)
$135,933.3 $43,750.0 $30,094.9 4Q
Actions
4Q Fly crewed Lunar Flyby test
Events/Observations
4Q Successful crewed Apollo lunar flyby
Analysis
The Apollo spacesuit (78% reliability) and the LEM (83.7% reliability) development continue to lag. Ideally, I would save time and expense by skipping the flyby and simply doing a test of the LEM in lunar orbit, and skip testing the LEM in earth orbit. However, because of the delays in the LEM and spacesuit, I opted for a manned lunar flyby mission, which was successful. The primary intent of this mission was to both increase the reliability of the Saturn V, and secondly to end any chance of the USSR doing a manned circumlunar flight first. With luck, the LEM will be ready next quarter for testing. If not, I may opt for a lunar orbital mission before proceeding with LEM testing flights.
At this point, the NASA flight controllers are highly experienced, and are ready for lunar missions (Image 1)
Image 1
