Factory Evac

Post bug reports and request support here.

Moderators: Joel Billings, Sabre21, elmo3

Post Reply
Chris21wen
Posts: 7944
Joined: Thu Jan 17, 2002 10:00 am
Location: Cottesmore, Rutland

Factory Evac

Post by Chris21wen »

Not sure if there's a bug.

In the pic the cost to evac each T-34 factory is 1184. The manual say the cost per factory point is Build Cost x 4(after v1.03 Beta 3 - February 7, 2011 patch). I've check the build cost of this T-34 and it 377 which when x4 does not equal 1184 as stated in evac cost.

So bug or have I missed a patch?


Image
Attachments
Capture.jpg
Capture.jpg (37.22 KiB) Viewed 213 times
Chris21wen
Posts: 7944
Joined: Thu Jan 17, 2002 10:00 am
Location: Cottesmore, Rutland

RE: Factory Evac

Post by Chris21wen »

Found another patch that reduced factory evacuation costs by 20% but doesn't work either.
Chris21wen
Posts: 7944
Joined: Thu Jan 17, 2002 10:00 am
Location: Cottesmore, Rutland

RE: Factory Evac

Post by Chris21wen »

Like a dog with a bone.

Working backwards.

add 20% to 1184 results in 1480.
1480/4 = 370 getting close 10 the 377 cost but no cigar.

When AFV leave a factory (21.1.7)they have no crew. So could this be a crew thing I.e. a 4 man crew costs 7?

This works for the T-60. It costs 72, has a crew of 2.

72-2 = 70 x 4 = 280 x 80% = 224 which is the evac cost for the T-60.
User avatar
thedoctorking
Posts: 3032
Joined: Sat Apr 29, 2017 12:00 am

RE: Factory Evac

Post by thedoctorking »

Impressive deduction!
Post Reply

Return to “Tech Support”