Condition of Pre WW2 Annexed Nations Railways

The sequel of the legendary wargame with a complete graphics and interface overhaul, major new gameplay and design features such as full naval combat modelling, improved supply handling, numerous increases to scenario parameters to better support large scenarios, and integrated PBEM++.
Post Reply
User avatar
Lobster
Posts: 5582
Joined: Thu Aug 08, 2013 2:12 pm
Location: Third rock from the Sun.

Condition of Pre WW2 Annexed Nations Railways

Post by Lobster »

https://www.feldgrau.com/WW2-German-Bal ... -Railroads

Military Railroads in the Baltic States 1940 to 1945

WW2 German Railroads Baltic States

With the incorporation of the Baltic States into the Soviet Union in 1940, approximately 7.000 km (4.500 miles) of rail lines were added to the Soviet rail network. Of those 7.000 km (4.500 miles), approximately 2.900 km (1.900 miles) were wide gauge (1.524mm), 2.000 km (1.300 miles) were standard gauge (1.435mm) and 2.100 km (1.400 miles) were narrow gauge lines. Nearly all of the rail lines the Soviets inherited from the former Estonian, Latvian and Lithuanian railroad administrations were in excellent technical order; though very few were electrified. After the Soviet annexation, all of the railroad engines of the former Baltic States were re-identified with Cyrillic letters, though they were a direct translation of their Latin text equivalents.

In addition to the military and political forces brought in to the Baltic States, the Soviets also imported a large number Soviet railroad engines and rolling stock into the Baltic States. Interestingly, the Soviets did not begin to convert the standard and narrow gauge lines in Estonia, Latvia, and Lithuania over to wide gauge until March of 1941. It need be remembered that many of the existing rail lines in the Baltics originated from the Czarist period, thus they remained in the wide gauge throughout the interwar period. This allowed the Soviets to use many of the main trunk lines in the Baltics with no difficulties. The Soviets placed their primary rail conversion efforts in Lithuania as well as in the former Vilnius territory plus eastern Poland - that is, they converted those rail lines first which was closest to the German-Soviet border regions.


Many scenario designers seem to have missed this.

Edit: I should add that, for some reason, having the rail lines through the newly acquired Soviet territories already converted to Europe standard gauge is deeply ingrained in the war gaming community and has been for some time. One game where they got it right was in SPI's War in the East published long, long ago.
ne nothi tere te deorsum (don't let the bastards grind you down)

If duct tape doesn't fix it then you are not using enough duct tape.

Two things are infinite: the universe and human stupidity and I’m not sure about the universe-Einstein.
User avatar
Zovs
Posts: 9275
Joined: Sun Feb 22, 2009 11:02 pm
Location: United States

RE: Condition of Pre WW2 Annexed Nations Railways

Post by Zovs »

Good point on standard and wide gauge but TOAW only has one rail gage so you'd have to break the line when you designed.

SPI War in the East (1974) and then War in Europe (1976) by defacto had you convert those rail lines. But a better representation was by GDW and first DNO and then later Fire in the East/Scorched Earth had rules for both standard and wide gauge and each its own rail capacity and each had to be converted (back and forth) and only one side or the other could use there gauge until it was converted.
Image
Beta Tester for: War in the East 1 & 2, WarPlan & WarPlan Pacific, Valor & Victory, Flashpoint Campaigns: Sudden Storm, Computer War In Europe 2
SPWW2 & SPMBT scenario creator
Tester for WDS games
Post Reply

Return to “The Operational Art of War IV”