German 120mm Mortar production

This is meant for reports dealing with issues only on the scenario/unit data and map data.

Moderator: Joel Billings

Post Reply
User avatar
Wiedrock
Posts: 1516
Joined: Tue Oct 11, 2022 7:44 pm
Location: Germany

German 120mm Mortar production

Post by Wiedrock »

Ignoring exports:
The Figures my Quartermaster reports provide are about the same as can be found on LdW.
This means 8461 were produced in total/until war ended (I again assume production figures end with surrender date).
The production starts in 01/1943, to get to 8461 being produced till surrender the weekly build limit needs to be 69 (being 8487 produced) from now 72 (being 8856) so currently 395 too many built.

Exports:
Currently the game has no "conversions" from German production.
Following the Exports I have, happening from July 1944 onwards (July being the 08/1944 report). Don't have data after that. I assume they all went to HUN but can't say for sure.

If we now apply the -141 exports to the initial number so about 8461-141=8320 get produced, we need to put the weekly build limit to 68 (being 8364 produced till surrender).

SUMMARY:
So build limit 72→68.
(...or 69 + figuring out all the exports "known" and unknown in 1945)
Attachments
GrW42_exports 1944.jpg
GrW42_exports 1944.jpg (48.06 KiB) Viewed 71 times
Post Reply

Return to “Scenario Data / Map Issues”