2+ RR engineers on one line?

Share your gameplay tips, secret tactics and fabulous strategies with fellow gamers here.

Moderators: Joel Billings, Sabre21

User avatar
Flaviusx
Posts: 7732
Joined: Wed Sep 09, 2009 3:55 pm
Location: Southern California

RE: 2+ RR engineers on one line?

Post by Flaviusx »

Indeed. There's no fog of war here guys. You can track exactly where the rail repair is at and how far units are from a railhead.

The other thing to bear in mind what the supply length of the Axis is going to be after they march forward the following turn. Bounding ahead may leave them high and dry. So you can position your forces to absorb the worst of it and then they're going to be out of gas and out of range of further buildups.
WitE Alpha Tester
User avatar
mmarquo
Posts: 1376
Joined: Tue Sep 26, 2000 8:00 am

RE: 2+ RR engineers on one line?

Post by mmarquo »

I have always wondered whether repairing railheads in a prior turn actually extends the logistical net the next turn; here it is:


Supply segment (20.4.2)
„h Emergency vehicle reallocation sub- segment (20.1.4.2)
„h Set Unit Supply Requirements sub-segment (20.1)
„h First supply delivery sub-segment (from HQ units) (20.4.2)
„h Automatic Rail Repair Unit movement sub-segment (14.2.2)
„h Emergency Rail Repair sub-segment (14.2.2)
„h Second supply delivery sub-segment (from Railheads) (20.4.2)

So, the logistal net does extend as far as the repairs are finished in the Automatic Rail Repair phase prior to the Second suppply delivery sub-segment.

Marquo


Post Reply

Return to “The War Room”