Production upgrade path of the A8R7 assembly bugged

Post bug reports and request technical assistance here.

Moderators: simovitch, warshipbuilder

Post Reply
ReDDoN45
Posts: 135
Joined: Mon Feb 25, 2002 10:00 am

Production upgrade path of the A8R7 assembly bugged

Post by ReDDoN45 »

In a hands-off test campaign of the 44 campaign with computer production control, I´ve seen the Fw190A8/R7 assembly production upgrade to (), i.e. it upgrades to nothing, the assembly just vanishes for good.

I think this is easy to fix and related to the upgrade path of the Fw190A8/R7, as it is designed to upgrade to the Do-335B (at least this is stated in the tabula:

tm.asp?m=2376274

Since this aircraft is not directly produceable, as it is a gun-pack version of the Do-335A. Would be a good explaination for this self-destructory behaviour... Speer wouldn´t be happy either. Propably one should check through all those aircraft upgrades to be designated to upgrade to a gun-pack version of any plane and change it to the base version of the plane, as some players actually might use the computer production control.
Bis dat qui cito dat!
Post Reply

Return to “Tech Support”