A question for you Royal Navy types (I know you are out there)
Moderators: wdolson, MOD_War-in-the-Pacific-Admirals-Edition
A question for you Royal Navy types (I know you are out there)
Looking at the Ark Royal ii (or Audacious) and Hermes ii classes of carriers.
The Ark Royals had all been laid down in late 42 into 1943, and the Hermes (first three) in the first half of 1944 (plus one more in 5/45).
None of these were even launched by the end of the war, and completion (of those not cancelled) stretched on for years.
My question:
If the war in the pacific had not ended in late 1945 but continued for a couple more years... would these ships have been completed to their original designs? And, if so, about when would they be available?
OK, let me try a different tact
Does anyone have ship art for these two classes? I know Gary Childress has an excellent Malta but I don't know of any Ark Royal ii or Hermes ii sides/shills...
RE: OK, let me try a different tact
I think I have the Audacious class in a folder, but I won't be home till sometime Sunday. I wish I could remember where I got it from.
To the original question, none of my books go into why there were the delays, if we knew that we might be able to extrapolate how long it would have taken to finish them if the war needed them.
Another thing to think about, all the Essex class that got cancelled in 44/45. Did you include those in your game?
To the original question, none of my books go into why there were the delays, if we knew that we might be able to extrapolate how long it would have taken to finish them if the war needed them.
Another thing to think about, all the Essex class that got cancelled in 44/45. Did you include those in your game?
- DuckofTindalos
- Posts: 39781
- Joined: Fri Apr 22, 2005 11:53 pm
- Location: Denmark
RE: A question for you Royal Navy types (I know you are out there)
I think the delays were ascribed to the same reason that the Lion class got cancelled: limited yard space that had to be used for more urgent tasks. None of the ships were expected to enter service until 1950/51.
We are all dreams of the Giant Space Butterfly.
RE: A question for you Royal Navy types (I know you are out there)
warspite1ORIGINAL: Don Bowen
Looking at the Ark Royal ii (or Audacious) and Hermes ii classes of carriers.
The Ark Royals had all been laid down in late 42 into 1943, and the Hermes (first three) in the first half of 1944 (plus one more in 5/45).
None of these were even launched by the end of the war, and completion (of those not cancelled) stretched on for years.
My question:
If the war in the pacific had not ended in late 1945 but continued for a couple more years... would these ships have been completed to their original designs? And, if so, about when would they be available?
Never mind.....[8|]
Now Maitland, now's your time!
Duke of Wellington to 1st Guards Brigade - Waterloo 18 June 1815
Duke of Wellington to 1st Guards Brigade - Waterloo 18 June 1815
- DuckofTindalos
- Posts: 39781
- Joined: Fri Apr 22, 2005 11:53 pm
- Location: Denmark
RE: A question for you Royal Navy types (I know you are out there)
Plus, the RN built their series of light carriers IRL, where are they in this scenario?
We are all dreams of the Giant Space Butterfly.
RE: A question for you Royal Navy types (I know you are out there)
I'm looking at possibilities for an extended war in the Pacific. Basic premise has Japan holding out longer and Kamikazes taking a heavy toll.
The British had only the six large fleet carriers and were concentrating on slower CVL that were really improved CVE - merchant construction standards and medium speeds (Colossus/Majestic). These would have (obviously I think) been completed had the war continued. Also the classes of cruisers and destroyers currently in production.
Sitting (languishing) on the ways were the Audacious and Hermes ii classes, with some more Hermes planned but not yet laid down.
So, what would have happened if the existing British carrier fleet was decimated in late 1945/early 1946?
I am simply exploring the possibility of the British really needing these new carriers, and how long it would take to get them into service if they were assigned top priority.
RE: A question for you Royal Navy types (I know you are out there)
Are these any good? Audacious CV and Centaur CVL


- Attachments
-
- Untitled.jpg (11.22 KiB) Viewed 632 times
[center]
Bigger boys stole my sig

Bigger boys stole my sig
RE: A question for you Royal Navy types (I know you are out there)
Those look great! Do you happen to have them in .bmp ??
RE: A question for you Royal Navy types (I know you are out there)
To figure this out, you need to step way back and then feed-forward. When things were hot and decks were a priority, this is what the Brits could do.
Illustrious Class
Avg 24 months from Keel to launch. Launch included flight deck layout.
Avg 21 months from launch to completion.
Avg 6 months from completion to commission. Includes sea trials.
Add a couple months for workup to deployment.
Indefatigable Class
Avg 26 months from Keel to launch. Launch included flight deck layout
Avg 16 months from launch to completion.
Avg 6 months from completion to commission. Includes sea trials.
So they took the Indefatigables from 51 months to 48. Sounds about right given the heat. But your paradigm needs to determine where your vessels were in the flow when the Admiralty Order to “Gimme them Now!” came down. Shipbuilding is a three part process. You gotta build the hulls, and that ain’t hard, because who wants something on the ways that’s gonna interfere with commercial enterprise?
So if they are finished “enough” then get ‘em done and launch ‘em; let the RN sort it out. Otherwise, cannibalize the steel and do something else. So your paradigm needs to think about where these vessels were in the construction flow.
Some of them, depending on timing, could have been accelerated, depending on their positioning in the flow. The others, would drift into the nether-land of immediate post war imperatives and die a natural death.
Just myo. John
Illustrious Class
Avg 24 months from Keel to launch. Launch included flight deck layout.
Avg 21 months from launch to completion.
Avg 6 months from completion to commission. Includes sea trials.
Add a couple months for workup to deployment.
Indefatigable Class
Avg 26 months from Keel to launch. Launch included flight deck layout
Avg 16 months from launch to completion.
Avg 6 months from completion to commission. Includes sea trials.
So they took the Indefatigables from 51 months to 48. Sounds about right given the heat. But your paradigm needs to determine where your vessels were in the flow when the Admiralty Order to “Gimme them Now!” came down. Shipbuilding is a three part process. You gotta build the hulls, and that ain’t hard, because who wants something on the ways that’s gonna interfere with commercial enterprise?
So if they are finished “enough” then get ‘em done and launch ‘em; let the RN sort it out. Otherwise, cannibalize the steel and do something else. So your paradigm needs to think about where these vessels were in the construction flow.
Some of them, depending on timing, could have been accelerated, depending on their positioning in the flow. The others, would drift into the nether-land of immediate post war imperatives and die a natural death.
Just myo. John
Nous n'avons pas peur! Vive la liberté! Moi aussi je suis Charlie!
Yippy Ki Yay.
Yippy Ki Yay.
RE: A question for you Royal Navy types (I know you are out there)
Dixie's artwork is way, way better but here are the versions I use in my mod.
- Attachments
-
- Centaur.zip
- (61.87 KiB) Downloaded 34 times
John
WitE2 Asst Producer
WitE & WitW Dev
WitE2 Asst Producer
WitE & WitW Dev
RE: A question for you Royal Navy types (I know you are out there)
ORIGINAL: Symon
To figure this out, you need to step way back and then feed-forward. When things were hot and decks were a priority, this is what the Brits could do.
Illustrious Class
Avg 24 months from Keel to launch. Launch included flight deck layout.
Avg 21 months from launch to completion.
Avg 6 months from completion to commission. Includes sea trials.
Add a couple months for workup to deployment.
Indefatigable Class
Avg 26 months from Keel to launch. Launch included flight deck layout
Avg 16 months from launch to completion.
Avg 6 months from completion to commission. Includes sea trials.
So they took the Indefatigables from 51 months to 48. Sounds about right given the heat. But your paradigm needs to determine where your vessels were in the flow when the Admiralty Order to “Gimme them Now!” came down. Shipbuilding is a three part process. You gotta build the hulls, and that ain’t hard, because who wants something on the ways that’s gonna interfere with commercial enterprise?
So if they are finished “enough” then get ‘em done and launch ‘em; let the RN sort it out. Otherwise, cannibalize the steel and do something else. So your paradigm needs to think about where these vessels were in the construction flow.
Some of them, depending on timing, could have been accelerated, depending on their positioning in the flow. The others, would drift into the nether-land of immediate post war imperatives and die a natural death.
Just myo. John
This is getting interesting.
A couple of things I don't know and wish I did.
- How close to launch were the most advanced units of each class as of 9/45?
- If some of the Illustrious and Unpronounceable classes had been lost prior to 9/45, would the British have accelerated the Audacious class?
In some ways I miss the Japanese-only functions to prioritize ships in the queue. For my mod, I'm considering putting in the first 2 Audacious and the first 4 Centaur with 1946 arrivals and lots of damage (at the UK Base). Also many other British ships not completed at the end of the war. Then emulate construction prioritization with repair prioritization.
Don't want to get too far out in left field, but I am intrigued by "what if" for a longer war.
RE: A question for you Royal Navy types (I know you are out there)
This has the date each carrier was laid down. That might help:
http://en.wikipedia.org/wiki/List_of_aircraft_carriers_of_the_Royal_Navy
Bill
http://en.wikipedia.org/wiki/List_of_aircraft_carriers_of_the_Royal_Navy
Bill
WIS Development Team
RE: A question for you Royal Navy types (I know you are out there)
Thanks Bill
I'm working from
http://www.amazon.com/British-Empire-Wa ... 23&sr=1-20
which gives a lot of data and is what is generating all these questions...
RE: A question for you Royal Navy types (I know you are out there)
ORIGINAL: Dixie
Are these any good? Audacious CV and Centaur CVL
![]()
Is that Centaur a late-life version. I notice the large port side sponson - in the original design I believe there was a deck-edge lift instead???
RE: A question for you Royal Navy types (I know you are out there)
Don. after doing some more reading, I am not sure they really could have built them faster, maybe take off a year. It appears they had a hard time with the design.
RE: A question for you Royal Navy types (I know you are out there)
ORIGINAL: oldman45
Don. after doing some more reading, I am not sure they really could have built them faster, maybe take off a year. It appears they had a hard time with the design.
Very true. The Audacious class went through at least two major design changes which caused the extensive delay in completion.
During the war, they were redesigned to take the (larger) USN carrier aircraft. This required hanger heights to be increased to 17 1/2 feet, with corresponding upward changes in general size.
AFTER the end of the war, it was decided to re-design again "to incorporate the sum total of war experience". This, combined with post war conditions, led to even more delays in completion.
I note with chagrin that none of these ships were launched by the end of the war, but I am pressing ahead regardless.
What if the small number of British fleet carriers had been reduced by heavy losses in the Pacific? Perhaps even in 1942?
I think this gives two opportunities for the earlier completion of these ships:
1. Early to mid war losses would have to be replaced lest the Royal Navy end up with insufficient fleet carriers to conduct operations in late 1945 and on.
2, If the war did not end in late summer, 1945, the second redesign possibly/probably may not have taken place.
This is the historical justification that I am using. For game purposes, I am concerned that a little bad luck in early/mid war could reduce the Royal Navy's carrier forces to insignificance.
Edited to de-finger flub!
RE: A question for you Royal Navy types (I know you are out there)
ORIGINAL: Don Bowen
ORIGINAL: Dixie
Are these any good? Audacious CV and Centaur CVL
![]()
Is that Centaur a late-life version. I notice the large port side sponson - in the original design I believe there was a deck-edge lift instead???
The pics I've seen are two lifts in the flight deck. The image was made from this pic on navypedia but with a few changes to the mast and radar fit. Some other versions of HMS Centaur as built are on this page: http://www.shipbucket.com/forums/viewto ... =12&t=1745

- Attachments
-
- brit_c77.gif (58 KiB) Viewed 618 times
[center]
Bigger boys stole my sig

Bigger boys stole my sig
RE: A question for you Royal Navy types (I know you are out there)
Obviously right, Sir.
That'll teach me to believe stuff from Wikipedia.
Don
edit: Great drawings on shipbucket. I wish someone had one for the original design (or as of 1945).
I can see that the sponson was always there. Used to support the port-side AA armament before becoming a deck extension support.
That'll teach me to believe stuff from Wikipedia.
Don
edit: Great drawings on shipbucket. I wish someone had one for the original design (or as of 1945).
I can see that the sponson was always there. Used to support the port-side AA armament before becoming a deck extension support.
RE: A question for you Royal Navy types (I know you are out there)
Using your arguement, I could see at least one of the Audacious coming out in 45. On the flip side, perhaps they would build more in the CVL range to go in a support role with the US CV's. If the war was going badly for the Allies, you would have several US carriers completed instead of being canceled. Perhaps the US would turn them over to the Brits.






