ORIGINAL: Andrew Brown
Regarding the Spitfire Vb and possible changes:
ORIGINAL: timtom
I can think of four solutions, other than sleeping dogs:
1) Include an Oz Spit
Not at this late stage. Maybe for a future update (and this is the option I already think is the best in the long run).
2) Cut the Spit Vb out of the SEAC RAF UP, effectively turning the Vb into the Oz Spit. The Spit VIII arrives 10/43.
I thought of that as well, but it would depend on how many Vb vs VIII were used in SEAC. I don't know the answer to that question.
3) Have the sqds in Q arrive overstrength. As long as the overstrength aircraft are assigned as ready and not damaged, they'll revert to reserve status. When the sqd moves, the reserve aircraft are left behind as a fragment, which can either be disbanded or left to chase after the mother unit. AFAIK, it doesn't greater supersize units, only units with lots of pilots. Obviously the excess aircraft could be assigned other units, but the total no. of aircraft will remain the same.
An interesting idea but a bit too contrived for my tastes.
4) Lower the Spit Vb replacement rate.
My preference, instead of doing this, would be to move the Spit Vb arrival date from 6/42, which doesn't seem to be supported at all for any air force (as I already mentioned above), to 1/43. Not a perfect solution, but a step in the right direction, and simple to make.
Andrew
Do all this and put 11 Spitfire Vb in the pool at start (for No. 457 RAAF)...



